OEC 9800 Installation Procedure
1
Service
Periodic
Contents
Schematics
Illustrated
Installation
Contents
Overview.........................................................................................................................................................................3
Unpacking the System ..................................................................................................................................................3
Depalletization Performed By .......................................................................................................................................4
Installation Report .........................................................................................................................................................5
C-Arm Damage Inspection ...........................................................................................................................................5
Workstation Damage Inspection...................................................................................................................................5
Inventory of Customer Items.........................................................................................................................................6
C-Arm Items ..............................................................................................................................................................6
Workstation Items......................................................................................................................................................6
Optional Equipment...................................................................................................................................................6
Installation Procedures .................................................................................................................................................6
Cover Removal, Internal & Cable Inspection, Partial Setup..........................................................................................7
Mechanical Checks.....................................................................................................................................................10
The Power Cord Assembly .........................................................................................................................................10
Isolation Transformer Strapping .................................................................................................................................12
Power ON System ......................................................................................................................................................16
Line Voltage Regulation..............................................................................................................................................20
C-Arm Control Panel and Foot/handswitch Check .....................................................................................................21
Workstation Keyboard Check .....................................................................................................................................24
Backup the Configuration Files...................................................................................................................................25
Options .......................................................................................................................................................................26
Cine Archive Disk Test ............................................................................................................................................26
High Capacity Disk Test ..........................................................................................................................................26
VCR Test.................................................................................................................................................................26
IR Transmitter Test..................................................................................................................................................26
Digital Hardcopy Camera test..................................................................................................................................27
Instant Film/Paper (Onboard) Printer.......................................................................................................................27
Thermal Printer Test................................................................................................................................................27
Question and Answer IconNeed help?

Do you have a question about the GE OEC 9800 and is the answer not in the manual?

GE OEC 9800 Specifications

General IconGeneral
TypeMobile C-arm
Digital ImagingYes
X-Ray Tube TypeRotating anode
Frame Rate30 fps
Pulse ModeYes
Last Image HoldYes
RoadmappingYes
Image Intensifier Size9 inches
Imaging ModesFluoroscopy, Digital Subtraction Angiography
kV Range40-120 kV
Focal Spot Size0.3 and 0.6 mm
ManeuverabilityMotorized
MonitorsDual monitors
WeightApproximately 1, 100 lbs (500 kg)

Summary

Unpacking the System

Depalletization Performed By

Installation Report

C-Arm Damage Inspection

Inspect the C-Arm for damages and record information in the 9800 Installation Report/Checklist.

Workstation Damage Inspection

Inspect the Workstation for damages and record information in the 9800 Installation Report/Checklist.

Installation Procedures

Cover Removal, Internal & Cable Inspection, Partial Setup

Inspect cables and internal components after removing covers, observing safety procedures.

Mechanical Checks

Verify the full range of motion for C-Arm and Workstation mechanical components.

Isolation Transformer Strapping

Select correct tap voltage for isolation transformer input based on measured wall voltage.

Power ON System

Steps to power on the system and verify initial boot, fan operation, and elapsed time meter.

Line Voltage Regulation

Measure wall outlet voltage before and during X-ray exposure to calculate line voltage regulation.

C-Arm Control Panel and Foot/handswitch Check

Verify C-Arm control panel functions, image orientation, and foot/handswitch operations.

Radiographic Beam Alignment Test

Film Exposure

Check film processor availability, then perform specific X-ray exposures for beam alignment.

Reporting

Reporting for International Systems