EasyManua.ls Logo

GE C-Start - Step 6: Turn The Power Back On

GE C-Start
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
After the switch is secured and faceplate mounted,
turn the power back on at the circuit breaker box.
At the switch, the light ring will flash blue indicating the device
is wired correctly and the device is in setup mode.
STEP 6
Turn The Power Back On
ON OFF

Related product manuals