EasyManua.ls Logo

GE ZTS Series User Manual

GE ZTS Series
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
GE Zenith Controls
e
ZTS/ZTSD Series Transfer Switches
40-4000 Amps
71R-3000
5/03
Operation and Maintenance Manual

Questions and Answers:

GE ZTS Series Specifications

General IconGeneral
BrandGE
ModelZTS Series
CategorySwitch
LanguageEnglish

Summary

Introduction to GE Zenith Controls Transfer Switches

Safety Guidelines

General safety guidelines for operating the transfer switch.

Installation Procedures

Procedures and considerations for installing the transfer switch.

Maintenance and Testing Procedures

Procedures for maintaining and testing the switch.

Troubleshooting and Diagnostics

Guide for identifying and resolving switch issues.

Safety Information

Hazardous Voltage Warnings

Warning about severe injury or death from hazardous voltage.

Equipment Inspection and Storage

Instructions for inspecting and storing the transfer switch.

Installation Safety Precautions

Precautions for installation, including mounting and drilling.

Installation Process

Power Connections

How to connect power conductors to the transfer switch terminals.

Engine Start Control Connections

Connecting engine start control wires to designated terminals.

Initial Energization Steps

Energization Procedure

Step-by-step procedure for initial energization of the switch.

Voltage and Frequency Verification

Verifying source voltage and frequency before energization.

Energization and Setup Completion

Final Setup and Inspection

Completing setup and visual inspection before final energization.

Control Wiring

Microcontroller and Field Connections

Details on control connections to the microcontroller and field wiring.

Entelli-Switch 250 Controller Components

Microprocessor Assembly

Components and functions of the microprocessor assembly.

Relay/Transformer (R/T Box)

Components and purpose of the R/T box.

LCD and Keypad Interface

User Interface Navigation

Navigating options via LCD screen and keypad for settings.

Voltage and Frequency Settings

Source 1 Voltage and Frequency Adjustments

Adjusting 'Fail' and 'Restore' points for Source 1 voltage/frequency.

Source 2 Voltage and Frequency Adjustments

Adjusting 'Fail' and 'Restore' points for Source 2 voltage/frequency.

Accessory Definitions

Definitions of Common Accessories

Definitions and functions of accessories like 6P, 6A, A1, etc.

Definitions of Specific Accessories

Continued definitions of accessories, including M1, M2, P1, Q2, etc.

Definitions of Advanced Accessories

Further definitions for accessories like R50, S5P, S12P, T, U.

System Clock Setup

System Clock Setting Procedure

Step-by-step guide to set the system clock, time, and date.

CDT One Event Timer Exerciser

CDT Exerciser Configuration and Settings

How to configure and set the CDT timer exerciser parameters.

Managing CDT Exerciser Events

Procedures for initiating, bypassing, and checking CDT exercises.

CDP Clock Exerciser Setup

CDP Clock Exerciser Configuration and Settings

How to configure and set the CDP clock exerciser parameters.

Managing CDP Clock Exerciser Events

Procedures for bypassing and checking CDP exerciser events.

Entelli-Switch 250 User Setup - CFG Menu

Accessory Configuration Options

Turning optional accessories ON or OFF via the CFG menu.

Entelli-Switch 250 User Setup - SET Menu

Adjustable System Settings

Changing adjustable values for system clock, timers, and voltages via SET menu.

Entelli-Switch 250 User Setup - System Info

Viewing System Data and Information

How to view system voltage, frequency, exerciser status, and event logs.

Transfer Switch Testing

ATS Testing Procedures

Steps for performing ATS tests including XFR LOAD, FAST TEST, and NO XFR.

Transition Test Sequences

Test sequences for Standard and Delayed Transition operations.

Sequence of Operation

Standard Transition Operation

Detailed sequence for standard transition during power failure and restoration.

Delayed Transition Operation

Detailed sequence for delayed transition during power failure and restoration.

Relay/Transformer (R/T Box) Details

Standard Transition R/T Box Components

Layout and bill of materials for standard transition R/T boxes.

Delayed Transition R/T Box Components

Layout and bill of materials for delayed transition R/T boxes.

R/T Box Wiring Schematics

Wiring diagrams for standard and delayed transition R/T box components.

Troubleshooting and Diagnostics

Hazardous Voltage Warnings

Warning about severe injury or death from hazardous voltages during troubleshooting.

General Troubleshooting Guide

Guide for recognizing, determining, and resolving basic switch faults.

Maintenance and Testing Procedures

Maintenance Precautions and Procedures

Cautions and steps for inspection, cleaning, and servicing the switch.

Electrical Testing Procedures

Manual and electrical testing of the transfer switch, including timers.

Replacement Parts - Standard Transition (40-200 Amps)

Replacement Parts - Standard Transition (225-400 Amps)

Replacement Parts - Standard Transition (600-1200 Amps)

Replacement Parts - Standard Transition (1600-3000 Amps)

Replacement Parts - Standard Transition (4000 Amps)

Replacement Parts - Delayed Transition (40-400 Amps)

Replacement Parts - Delayed Transition (600-1200 Amps)

Replacement Parts - Delayed Transition (1600-3000 Amps)

Replacement Parts - Delayed Transition (4000 Amps)

Control Panel Layout

Standard Control Panel Layout (SSRCP)

Diagram showing the layout of the standard control panel (SSRCP).

Panel Mount Control Relays

Identification of individual relays mounted on the control panel.

Adjustments and Settings

Solid State Timer Adjustments

How to adjust solid state timers for timing cycles.

Voltage/Frequency Sensor (VFSM) Settings

Adjusting the VFSM for pickup and fail points.

Solid State Phase Relay (ARSM) Settings

Adjusting ARSM relay for restore and dropout points.

Related product manuals