EasyManua.ls Logo

GE GDF510PGDBB

GE GDF510PGDBB
119 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39 /
Copyright General Electric 2011
9/23/2012
Correct installation includes the bellows being installed properly
above a tad located on the offset leg assembly as shown below.
Hinge
Arm on
door
Offset leg tab, is part of the
Structure or frame.
Bellows
The bellows is made of a PVC material
and very durable. It can be flexed into
and out of the tab on the offset leg. It
may be helpful to pull down on the center
To help flex the bellows.

Related product manuals