EasyManua.ls Logo

GE hydran m2 - Bleed Screw Orientation and Air Purging

GE hydran m2
51 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 23
Hydran* M2 Installation Guide
16375 v9.0 Oct 12
Figure 17: The Bleed Screw Must Be on Top, at the 12 O’clock Position
Figure 18: Opening the Valve and Purging the Air from the Sensor
Bleed screw must be on top, at
the “12 o’clock” position when
sensor is installed horizontally.
O-ring
1.
Loosen bleed screw.
2. Slowly open valve.
3. Purge air from sensor
(collect oil in bucket).
4. Tighten bleed screw.
5. Wipe oil from valve and
sensor using rag.
Note: The clamp ring is not
shown for clarity purposes.

Table of Contents

Related product manuals