EasyManua.ls Logo

GE JBP26 - 3-Wire Power Cord Connection

GE JBP26
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
~STMLAmON ~S~UC~ONS
(continued)
STEP4
3 WIRE POWERCORDINSTALMTIOH
Removethe 3 wire terminal screws horn
the connector block. Insert screws through
each power cord terminal ring and into the
connector block untilthe screws engage the
nuts. Be certain that the center wire is connected
to the center screw ofthe connector block.
Tighten screws securely.Do NOT remove
ground strap connection.
CONNECTOR
K
D
Po
W~NG: ~E NEUTRAL OR GROUND
WRE OF ~E POWER CORD MUST BE
CONNE=D TO = NE~
TERMINAL LOCATED IN ~E CENTER OF
~E CONNE~R B~CK ~E POWER
LEADS MUST BE CONNE~D ~ ~E
OUTSIDE (BRASS COLORED) TERMINALS.
STEP5
4 WIRE POWERCORDINSTALMTION
A. Removethe 3 screws from the connector
block.
B. Removethe grounding screw and strap from
the connecter block middle locationand the
screw connection to the frame ofthe range.
BEFORE
NEUTRAL
TERMINAL
GROUNDING STRAP Z
(GROUNDING TO RANGE)
C. Insert screws through each power cord
terminal ring and into connector block until
screw engages nut. Be certain that the center
wire is connected to the center screw ofthe
connector block.Tighten screws securely.
D. Attach ground wire to the tiame ofthe range.
0
‘%
WARNING: ~E NEUTRAL ~RE OF
SUPPLY CIRCU~ IS CONNE~D TO
~E NE~ TERMINAL LOCATED
IN ~E CENTER OF ~E CONNE~R
BLOCK ~E POWER LEADS MUST
BE CONNE~D TO ~E OUTSIDE
(BRASS CO~RED) TERMIN~. ~E
4~ GROUNDING LEAD MUST BE
CONNECTED TO ~E FRAME OF ~E
RANGE _ ~E GROUNDING SCREW.
32

Other manuals for GE JBP26

Related product manuals