EasyManua.ls Logo

GE Range

GE Range
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
Installation
ACCESSORIES—TOEKICK (provided)
Install the toekick after the range has been leveled.
Measure the distance between the floor
and the bottom of range.
Loosen the two screws on each end. Adjust
the toekick height by sliding the upper and lower
pieces apart to 1/8" less than the measured height.
Secure the top and bottom sections by tightening
the 2 screws on each end.
Push toekick against range leg until clip snaps
to legs.
NOTE: Be sure the toekick snaps securely to the leg.
Bottom
of Toekick
Screw
Push
Push
Top of
Toekick

Table of Contents

Other manuals for GE Range

Related product manuals