EasyManua.ls Logo

GEDA MAXI 150 S User Manual

Default Icon
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
BL 068 GB Edition 03/2015 Original operating manual
Assembly and Operating Manual
Scaffolding lifts
For the transport of burdens

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the GEDA MAXI 150 S and is the answer not in the manual?

GEDA MAXI 150 S Specifications

General IconGeneral
BrandGEDA
ModelMAXI 150 S
CategoryLifting Systems
LanguageEnglish

Summary

General safety information

Safety instructions for operating personnel

Crucial safety guidelines and personal protective equipment for operators.

Safety instructions for operation

Key safety rules to ensure safe operation, including emergency procedures.

Safety instructions for servicing, maintenance and troubleshooting

Safety precautions for maintenance, servicing, and troubleshooting activities.

Safety whilst working on the electrics

Specific safety instructions for qualified electricians working on electrical systems.

Technical description

Transport

Assembly

Assembling scaffolding lift

Detailed steps for installing the winch and pivot arm onto the scaffolding.

Installing the winch

Instructions for securely mounting the winch onto the vertical frame.

Installing the pivot arms

Guidance on installing different types of pivot arms and their mountings.

Pivot arm for the MINI 60 S

Specific instructions for installing the pivot arm on MINI 60 S.

Use with pivot arm mounting

How to use the pivot arm mounting for the MINI 60 S.

Universal pivot arm for the GEDA MAXI 120 S/150 S

Instructions for installing the universal pivot arm on MAXI models.

Pivot arm 300 kg [660 lb] for the GEDA MAXI 150 S

Details on installing the heavy-duty pivot arm for MAXI 150 S.

Electrical connection of the winch

Steps for correctly connecting the winch to the power supply.

Assembling the wire rope

Procedure for threading and securing the wire rope onto the winch.

Check after assembly and before each operation

Pre-operation checks to ensure safe and correct assembly.

Operation

Safety during operation

Critical safety rules and precautions for operating the scaffolding lift.

Operating the Scaffolding Lift

Instructions on how to use the ascent and descent functions.

Ascent

Procedure for lifting loads using the UP button.

Descent

Procedure for lowering loads using the DOWN button.

Emergency shutdown

How to activate the EMERGENCY STOP button for immediate shutdown.

Interrupting work – end of work

Steps to safely interrupt or conclude operations.

Dismantling (disassembly)

Maintenance - Checking - Cleaning

Inspections

Guidelines for various types of inspections before, during, and after use.

Maintenance schedule

Timetable for routine maintenance and inspection tasks.

Motor / Motor brake

Maintenance and function checks for the motor and its brake.

Checking / replacing the wire rope

Procedure for inspecting and replacing the wire rope.

Malfunctions - Diagnosis – Repair

Fault table

List of common faults, their causes, and remedial actions.

Fault rectification

Detailed procedures for rectifying specific faults.

Motor is not producing full output

Troubleshooting steps for low motor output.

Slack rope switch operated

Action to take when the slack rope switch is activated.

Wire rope winds on one side

Steps to correct improper wire rope winding on the drum.

Related product manuals