EasyManua.ls Logo

Generac Power Systems MLTS

Generac Power Systems MLTS
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28 Owner’s Manual for Mobile Light Tower
Operation
Tying Down the Unit
When securing the unit for transportation, verify the
equipment being used to fasten the unit is in good
condition and has sufficient strength to hold the unit in
place during transport.
See Figure 3-17. Use the tie-down points (C) as shown.
Figure 3-17. Tie-Down Points
C
002538

Table of Contents

Related product manuals