Do you have a question about the Genie GTH-2506 AU.3 and is the answer not in the manual?
Brand | Genie |
---|---|
Model | GTH-2506 AU.3 |
Category | Lifting Systems |
Language | English |
Highlights critical safety rules leading to severe injury or death.
Highlights risks of bodily harm and necessary precautions.
Details precautions to prevent explosions and fires.
Provides critical safety information regarding electrical hazards.
Details the Load Management System's function in monitoring stability.
Diagram illustrating the layout of the machine's control panel and components.
Diagram showing the layout of the machine's instrument panel indicators.
Outlines the importance and basic principles of pre-operation inspections.
Provides a detailed checklist and procedure for conducting a pre-operation inspection.
Explains the purpose and necessity of performing function tests.
Details the step-by-step procedures for testing various machine functions.
Procedure for testing the transmission and braking systems.
A checklist to identify and avoid hazardous situations in the workplace.
Critical safety requirements that must be met before operating the machine.
Detailed steps for safely starting the machine's engine.
How to operate the transmission control lever for forward, neutral, and reverse.
Guidelines for safely positioning and transporting loads on the forks.
Steps involved in safely lifting and placing loads using the boom.
Detailed steps and considerations for accurately placing a load.
Comprehensive explanation of the LMS, its function, and safety features.
Step-by-step guide for safely changing machine attachments.
Procedure for safely overriding the LMS in hazardous situations.
Description of the main screen displaying operational data and load charts.
Describes how the machine records, displays, and handles alarms and warnings.
Instructions on how to properly secure the machine onto a transport vehicle.
Guidelines for safely lifting the machine using appropriate rigging and equipment.
Overview of scheduled maintenance intervals and procedures.
Routine procedure for performing a pre-operation inspection.
Routine procedure for performing function tests on the machine.
Safety precautions and hazards related to lifting and handling suspended loads.
Details hazards and precautions to prevent overturning when handling suspended loads.
Precautions and steps for safely lifting loads with the boom.
Guidelines for safe travel when carrying a suspended load.
Detailed steps for safely placing a suspended load.
Operating limits and capacities for the machine with standard forks.
Operating limits and capacities for the machine with a fixed hook attachment.
Operating limits and capacities for the machine with a 2m jib attachment.
Operating limits and capacities for the machine with side shift forks.
Operating limits and capacities for the machine with extended forks.
Operating limits and capacities for the machine with a fork rotator.
Operating limits and capacities for the machine with a 500L GP bucket.
Operating limits and capacities for the machine with a 4-in-1 bucket.