EasyManua.ls Logo

Genrui FA50 - Installation; Introduction; Installation Requirements; Installation Environment

Genrui FA50
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Error! Use the Home tab to apply 标题 1 to the text that you
want to appear here.
FA50 Operation Manual 3
2 Installation
2.1 Introduction
The analyzer is tested and packed with care before it is shipped
from the factory. Inspect the carton carefully when you receive your
analyzer. If any sign of damage is found, contact Genrui customer
service department or your local distributor immediately.
2.2 Installation Requirements
Before the installation, the operator must ensure to satisfy the
following requirements for space, environment and power.
2.2.1 Installation environment
Content
Requirements
Location
1) Flat workbench with tilt < 1/200 and
sufficient intensity, which can bear the weight
of 50kg;
2) Dust-free, without corrosive and

Table of Contents