INSTALLATION
The washer-disinfector is shipped in separate modules. Only personnel from Getinge Desinfection AB or
personnel trained by Getinge Desinfection AB may assemble the modules and install the machine.
Before installation, the installation area must be prepared with connections for water, electricity, steam
and waste water as per the information in Installation drawings, Page 65, TECHNICAL DATA, Page
81 and Electrical connection, Page 52.
An example showing how the machine is delivered in modules.
1. Panel package module (load end, unload
end)
2. Glass Door Module
3. Chamber Extension Module
4. Dryer module
5. Core Module
6. Side spraying module
7. Electrical cabinet module
8. Heater, pump & piping module
9. Chamber Floor Module
Page 11 of 92