Install the upper steam pipe unit between the pipe in the lower steam pipe section and the
heating element. Attach the module on the chamber wall.
Connect the air hoses to the two valves on the steam pipe unit.
Install the steam pipes on top of the chamber.
1
001752
2 4
3
3
1. Steam pipe
2. Heating element
3. Valve
4. Upper steam pipe unit
Page 50 of 92
<Doc_INS><Doc_6001341302><Rel.A><Lang_en>

Other manuals for Getinge 9125

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge 9125 and is the answer not in the manual?

Getinge 9125 Specifications

General IconGeneral
BrandGetinge
Model9125
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals