1 Technical Data
The 24ci and 18si are delivered in two
separate packages:
• The boiler including fixing jig complete
with isolating valves and fittings.
• The flue system.
11658
Diagram 1.1
Net lift weight (boiler only)
24ci 34 kg
18si 32 kg
Gross lift weight
(boiler, fixing jig and packaging)
24ci 39 kg
18si 36 kg
2 General Information
740
184
310
410
IMPORTANT NOTICE.
Where no British Standards exists, materials and equipment
should be fit for their purpose and of suitable quality and
workmanship.
Refer to Manual Handling Operations, 1992 regulations.
The installation of this boiler must be carried out by a competent
person in accordance with the rules in force in the countries of
destination.
Manufacturer’s instructions must not be taken as overriding
statutory requirements.
2.1 Sheet Metal Parts
WARNING: When installing the appliance, care should be taken
to avoid any possibility of personal injury when handling sheet
metal parts.
2.2 Statutory Requirements
The appliance is suitable only for installation in GB and IE and
should be installed in accordance with the rules in force.
In GB the installation of the boiler MUST be carried out by a
competent person as discribed in the following regulations:
Manufacturer’s instructions, supplied.
The Gas Safety (Installation and Use) Regulations.
The appropriate Building Regulations, either The Building
Regulations, The Building Regulations (Scotland), The building
Regulations (Nothern Ireland).
The Water Fittings Regulations or Water Bylaws in Scotland.
The Health and Safety at Work Act, Control of Substances
Hazardous to Health (COSHH).
The Current I.E.E. Wiring Regulations.
Where no specific instructions are given, reference should be
made to the relevant British Standard Code of Practice.
In I.E the installation must be carried out by a competent person
and installed in accordance with the current edition of I.S. 813
"Domestic Gas Installations", the current Building Regulations
and reference should be made to the current ETCI rules for
electrical installation.
In GB the following Codes of Practice apply:
BS4814, BS5440 Part 1 and 2, BS5449, BS5546 Part 1, BS6700,
BS6798, BS6891 and BS7074 Part 1 and 2, BS7478, BS7593,
BS7671.
In IE: I.S.813, BS5546, BS5449, BS7074, BS7593.
Manufacturer’s notes must not be taken as overriding statutory
requirements.
BSI Certification
This boiler certificated to the current issue of EN 483 for
performance and safety.
It is important that no alteration is made to the boiler, without
permission, in writing, from Hepworth Heating Ltd.
Any alteration that is not approved by Hepworth Heating Ltd.,
could invalidate the warranty and could also infringe the current
issue of the Statutory Requirements.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Glow-worm 24ci and is the answer not in the manual?

Glow-worm 24ci Specifications

General IconGeneral
BrandGlow-worm
Model24ci
CategoryBoiler
LanguageEnglish

Related product manuals