EasyManuals Logo

Glow-worm 38cxi Instructions For Use Installation And Servicing

Glow-worm 38cxi
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
18
0020008154A
6.1 Appliance Pack
IMPORTANT: With regards to the Health and Safety Manual
Handling requirements, two persons shall be required to lift the
appliance, refer to Manual Handling section on page 5.
Please check the contents of packs as shown in diagram 6.1.
NOTE: The fittings pack is located in the base polystyrene
packing under the boiler base.
Remove the polystyrene end packing pieces then carefully lay
the boiler on its back, remove the two front casing panel
securing screws and lift off the panel from two retaining lugs.
Remove the transit packaging behind the front panel and
discard.
Carefully place front panel and screws to one side.
6 Installation Preparation
Diagram 6.1
12332

Other manuals for Glow-worm 38cxi

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Glow-worm 38cxi and is the answer not in the manual?

Glow-worm 38cxi Specifications

General IconGeneral
Model38cxi
CategoryBoiler
Output38 kW
Efficiency89.2%
Efficiency RatingA
ERP RatingA
Fuel TypeNatural Gas
MountingWall Mounted
Max. Working Pressure3 bar
Electrical Supply230V ~ 50Hz
Flow Rate at 35°C Rise15.7 litres/min
Central Heating Flow Temperature Range30°C to 80°C
TypeCondensing Combi Boiler
Flow Rate15.7 litres/min at 35°C rise

Related product manuals