7. TECHNICAL DATA
INJECTOR SIZES
Conversion to other gases
Injector Drill
N.G. TK-45 3.10 32
L.P. 1.85 49
N.G. TK-24,30,36 2.95
CONVERSION INSTRUCTIONS
To convert from N.G. to L.P. gas do the following:
1. Replace N.G. burner injectors with L.P. injectors (refer to table this page).
2 Replace pilot injectors to required size.
N.G. #32
L.P. #22
3. Disconnect regulator from gas supply line – Reconnect LPG regulator.
4. Reset pressure test point on manifold to 2.75 kPa.
5. Adjust burner aeration slide.
Relevant required gas pressures for use in conversion
Natural. 1.0 kPa W.G.
L.P. 2.65 kPa W.G.