EasyManua.ls Logo

Gossen MetraWatt PROFITEST INTRO - Page 44

Gossen MetraWatt PROFITEST INTRO
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44 GMC-I Messtechnik GmbH
Mains Connection Test — 3-Phase System — LCD Connection Pictographs
Is dis-
played
lc20
U
(3-phase measurement)
Clockwise rotation
Is dis-
played
lc21
U
(3-phase measurement)
Counter-clockwise rotation
Is dis-
played
lc22
U
(3-phase measurement)
Short between L1 and L2
Is dis-
played
lc23
U
(3-phase measurement)
Short between L1 and L3
Is dis-
played
lc24
U
(3-phase measurement)
Short between L2 and L3
Is dis-
played
lc25
U
(3-phase measurement)
Conductor L1 missing
Is dis-
played
lc26
U
(3-phase measurement)
Conductor L2 missing
Is dis-
played
lc27
U
(3-phase measurement)
Conductor L3 missing
Is dis-
played
lc28
U
(3-phase measurement)
Conductor L1 to N
Is dis-
played
lc29
U
(3-phase measurement)
Conductor L2 to N
Is dis-
played
lc30
U
(3-phase measurement)
Conductor L3 to N
Battery Test
Is dis-
played
All
Safety Shutdown
(Rechargeable) battery voltage is less than or equal to 8.0 V.
Reliable measurement is no longer possible.
Storage of measured values to memory is disabled.
Remedy: Rechargeable NiMH batteries must be recharged, or batteries must be
replaced towards the end of their service life.
PE Test
LCD LED
Is displayed
LIMIT
Lights up
red
U
(single-phase
measurement)
Potential difference 45 V to PE (earthing contact)
Frequency f 50 Hz
or
If L is correctly contacted and PE is interrupted (frequency f 50 Hz)
Status
Error
No.
Position of the
Function Switch
Function / Meaning
PE

Table of Contents

Related product manuals