Installation Manual
Stationary Trailer Refrigeration Unit
Page
24
71.01.121 / 00
Copyright by GOVI GmbH 2013. The reproduction of this document or any part there of is prohibited! The right is reserved to make technical changes in the course of further development!
1
Operation / Installation manual
3
Spanner for protection cover
2
Eye bolt 4
Power plug
Fig. 6-1 Delivery inspection / content of the box
5.
Check the contents of the box.
•
1 refrigeration unit wrapped in protective air cushion
•
1 operation manual resp. installation manual (1)
•
2 eye bolts (2)
•
2 spanners (3) for the turn-lock in the protection cover
•
1 power plug (4)
•
1 test certificate
501 N. Grandview Avenue #135
Daytona Beach, FL 32118
Email: sales@govitrailerrefrigeration.com
Inc.
govitrailerrefrigeration.com
GOVI Inc.
Inc.
GOVI Inc. (USA)
GOVI GmbH (Germany)