Reactor Error Code Trouble Shooting Guide
Rev 2.6 (02/2014) Page 15
238CR
5) Single phasing in a three phase system
o Verify line voltage between all 3 legs of power. L1 to L2, L2 to L3, and L1 to L3.
Note: If the customers incoming power has a Wild Leg/High Leg it must be
installed on the L3 terminal.