Electrical Installation
16
5 Electrical Installation
5.5 ‘W’ Plan System Schematic and Wiring Diagram - DuoWave Indirect Solar Cylinder and Boiler
Figure 5-2: ‘W’ Plan system schematic
Figure 5-3: ‘W’ Plan wiring diagram
Boiler
230V
50Hz
Room
Thermostat
LNE
2
1
CC
12
1234567
NEL
NEL
N
HW
HTG
L
8910
2
13
Radiator
Pump
3 port diverter valve
(not supplied)
3 port divert
valve (not
supplied)
Blue
Blue
Brown
Brown
Green/Yellow
2 port zone valve
(supplied)
2 port
zone valve
(supplied)
Note:
Orange and grey wires not
required electrically isolate
High limit Contr ol
Junction box
Time controller
Boiler
Pump
Grant DuoWave Indirect
water cylinder
Cylinder Dual
Thermostat
(Top Coil)