5.6 ‘Y’ Plan System Schematic and Wiring Diagram - DuoWave Indirect Solar Cylinder and Boiler
Figure 5-4: ‘Y’ Plan system schematic
Figure 5-5: ‘Y’ Plan wiring layout
Boiler
Radiator
Pump
Grant DuoWave Indirect
water cylinder
3 port mid-position
valve (not supplied)
2 port zone valve
(supplied)
230V
50Hz
Room
Thermostat
LNE
2
1
CC
12
1234567
NEL
NEL
N
HW On
HW Off
HTG
L
8910
2
13
Mid position
zone valve
White
Blue
Grey
Blue
Orange
Brown
Green/Yellow
2 port
zone valve
(supplied)
Green/Yellow
Note:
Orange and grey wires not
required electrically isolate
High limit Con trol
Cylinder Dual
Thermostat (Top Coil)
Junction box
Time controller
Boiler
Pump

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Grant DuoWave Series and is the answer not in the manual?

Grant DuoWave Series Specifications

General IconGeneral
BrandGrant
ModelDuoWave Series
CategoryWater Heater
LanguageEnglish