8.2.6 Disassembling the compressor
● Unloose the 3 pieces of nuts with gaskets; unsolder
the solder joints of the compressor's suction and
discharge pipe (As shown in Fig.8-23). Remove the
pipeline carefully and take out the compressor.
Solder joints
Nut with gasket (3 pieces)
Fig.8-23
8.2.7 Disassembling the electromagnetic four-way valve
● Screw off the fixing nut of the four-way valve coil
and remove the coil. Wrap the four-way valve with
wet sponge and unsolder the 4 solder joints on the
four-way valve to take off the four-way valve. (As
shown in Fig.8-24)
● Welding process should be as quick as possible and
the wetness of the wrapping sponge should be
maintained all the time. Be sure not to burn out the
lead wire of the compressor.