EasyManua.ls Logo

Gree CE52–24/F(C)

Gree CE52–24/F(C)
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Centralized Controller
3
Unit:mm
Fig.3.2 Dimension of Centralized Controller
Unit:mm
Fig.3.3 Dimension of Electric Box Cover
3.1 Installation Requirements
(1) Communication cord of the centralized controller and Multi-VRF (CAN
Network) must be selected according to the table below. Never use the
cable that is not in compliance with instructions of this manual.

Related product manuals