EasyManua.ls Logo

Gree D Series User Manual

Gree D Series
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Change for life
D Series Modular Air-cooled Scroll Chillers
Owner's Manual
Original Instructions
Commercial Air Conditioners
Thank you for choosing commercial air conditioners. Please read
t
his Owner s Manual carefully before operation and retain it for
f
uture reference.
If
you have lost the Owner's Manual,please contact the local agent
or
visit www.gree.com or send an email to global@gree.com.cn for
t
he electronic version.
GREE ELECTRIC APPLIANCES, INC. OF ZHUHAI
Applicable Models :
LSQWRF65M/D-M LSQWRF80M/D-M
LSQWRF65M/NaD-M LSQWRF80M/NaD-M
LSQWRF130M/D-M LSQWRF130M/NaD-M
LSQWRF160M/D-M LSQWRF160M/NaD-M

Other manuals for Gree D Series

Questions and Answers:

Gree D Series Specifications

General IconGeneral
BrandGree
ModelD Series
CategoryChiller
LanguageEnglish

Summary

To Users

Safety Notices

General Safety Warnings

Crucial warnings and cautions for safe operation, installation, and maintenance of the unit.

Safety Precautions for Usage and Maintenance

Essential safety guidelines for daily use, upkeep, and handling of the equipment.

Handling and Lifting Safety Precautions

Specific safety measures to follow when moving or lifting the chiller unit.

General Introduction

Product Overview and Applications

Introduction to the D series modular chillers, their features, and intended applications.

Product Data and Operating Range

Technical Specifications and Operating Range

Details on water flow, temperatures, pressures, and air side conditions for optimal performance.

Outline Dimension

Unit Physical Dimensions

Graphical representations and measurements of various chiller model dimensions.

Installation Instructions

General Installation Procedures

Guidelines for skilled technicians to ensure proper and safe chiller installation.

Acceptance Check Procedures

Steps for verifying equipment condition and completeness upon delivery.

Handling and Lifting Procedures

Instructions for safely moving and positioning the chiller during installation.

Installation Foundation Requirements

Specifications for the base and mounting to ensure stability and safety.

Vibration Reduction Methods

Techniques and components for minimizing vibration transmission from the unit.

Water System Considerations

Key requirements for the chilled water system, including piping, quality, and drainage.

Guidance to Controller Operation

Overview on Wired Controller

Introduction to the wired controller's function in system management and parameter display.

Control Panel of the Wired Controller

Detailed description of buttons, indicators, and the LCD display on the controller.

Wired Controller Operation Instructions

Procedures for turning the unit on/off, managing operational modes, and setting parameters.

Menu Operation Instructions

Guidance on navigating menus for settings like Run Mode, Timer, and Clock setup.

Module View Functionality

Checking the status and parameters of individual modules within the system network.

Temperature Monitoring

Viewing various temperature readings from sensors across the chiller unit.

State View Functionality

Checking the operational status of components like fans, compressors, and pumps.

Error View Functionality

Accessing and clearing present and historical error codes for fault diagnosis.

Parameter Setup Guide

How to adjust user and system-level parameters for optimal chiller performance.

Electric Control Cabinet

Wiring for Output Control Lines

Diagram and explanation for connecting control output lines to auxiliary heaters and pumps.

Specification of Power Cord and Air Switch

Guidelines for selecting appropriate power cables and air switches based on unit specifications.

Wiring of the Electric Control Cabinet

Detailed wiring diagrams for internal electrical components and power distribution.

Filed Wiring Guidelines

Safety codes and procedures for field wiring connections, including grounding.

Wiring between Chilled Modules

Instructions for connecting multiple chiller modules for integrated system operation.

Setup of Toggle Switches on the Motherboard

Configuration of hardware addresses using toggle switches on the motherboard.

Jumpers Configuration

Information on matching jumpers when replacing the main board.

Commissioning and Maintenance

Check before Startup

Essential checks to perform before energizing the system for the first time.

Water System and Quality Requirements

Standards for water quality and system setup prior to initial operation.

Trial Run Procedures

Steps for conducting an initial operational test of the chiller unit.

Routine Startup and Shutdown

Recommended sequence for starting up and shutting down the chiller unit.

Maintenance during Long-term Downtime

Procedures for preparing the unit for extended periods of non-operation.

Startup after Long-term Shutdown

Steps for bringing the chiller back online after a long shutdown period.

Parts Replacement Guidelines

Rules regarding the use of approved parts for replacements to maintain warranty.

Refrigerant Charging Procedures

Detailed steps for adding refrigerant to the system, including complete charging and adding.

Compressor Removal Procedures

Step-by-step instructions for safely removing the compressor from the unit.

Freeze Protection Measures

Methods to prevent damage from freezing, especially in low ambient temperatures.

Routine Maintenance Schedule

Recommended maintenance tasks for daily, weekly, quarterly, and yearly intervals.

General Precautions

Important safety and operational precautions to follow to ensure normal function.

Troubleshooting

Error Lists and Troubleshooting Measures

Common errors, their possible causes, and recommended solutions for diagnosing issues.

After-sales Service Information

Contact information and procedures for obtaining service and technical support.

Related product manuals