EasyManua.ls Logo

Gree FGR30Pd/DNa-X

Gree FGR30Pd/DNa-X
129 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GREE Duct type split Air conditioner Inverter Series
119
Disassembly and Assembly of 4-way valve
Remark: Make sure that there isn’t any refrigerant in pipe system and the power supply is cut off before removal of
4-way valve.
Step
Illustration
Handling Instruction
1.Remove electric coils of 4- way
valve.
Place electric coils far away from
the 4-way valve to prevent the
connecting line of 4-way valve from
burning when succeeding welding.
2.Disconnect the pipe (site D in
illustration) of 4-way valve and
discharge pipe.
Don’t leave welding slag inside
pipes.
3.Disconnect the pipe (site E in
illustration) of 4-way valve and
connecting pipe.
Don’t leave welding slag inside
pipes.
4.Disconnect the pipe (site C in
illustration) of 4-valve and
connecting pipe.
Don’t leave welding slag inside
pipes.
5.Disconnect the pipe (site S in
illustration) of 4-way valve and
connecting pipe.
Don’t leave welding slag inside
pipes.
6.Remove the 4-way valve.
Remove 4-way valve after it is
cooled.
Install new 4-way valve in reversed order and wrap it with wet cloth before welding.

Other manuals for Gree FGR30Pd/DNa-X

Related product manuals