EasyManua.ls Logo

Gree GUHD series - Page 148

Gree GUHD series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80DWFK6HULHV'&
,QYHUWHU6HUYLFH0DQXDO
145
Disassembly and Assembly of 4-way valve
Note: Before removing the 4-way valve, make sure that there is no refrigerant inside the pipe system and that the power
has been cut off.
Step Illustration Handling Instruction
1. Remove the 4-way
valve
Ɣ8VHJDVZHOGLQJWRKHDWWKHSLSHV
connected on the four opennings of
4-way valve. Then, pull them out from
4-way valve.
Ɣ%HIRUHZHOGLQJZD\YDOYHSOHDVH
record the orientation of 4-way valve
and installing position of each opening.
2. Remove 4-way valve
Ɣ5HPRYHWKHROGZD\YDOYHIURPWKH
unit.
3. Connect the new
4-way valve to the pipe.
Ɣ,QVWDOOWKHQHZZD\YDOYHWRFRUUHFW
position.
Ɣ:KHQZHOGLQJWKHZD\YDOYHSOHDVH
wrap the valve body with wet cloth,
thus to prevent the guide inside the
valve body from burn. Also take care to
SUHYHQWDQ\ZDWHUIURPÀRZLQJLQWRWKH
pipe.
Ɣ:HOG E\FKDUJLQJQLWURJHQZLWKWKH
nitrogen pressure kept at 0.5±0.1kgf/
cm
2
(relative pressure).
4.Establish vacuum
inside the system
through liquid valve.
Ɣ(VWDEOLVKYDFXXPLQVLGHWKHV\VWHP
through liquid valve.

Related product manuals