EasyManua.ls Logo

Gree GWH12ACC-K6DNA1F/I - Page 109

Gree GWH12ACC-K6DNA1F/I
125 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
106
Installation and Maintenance
Step Procedure
7. Remove gas valve and liquid valve
Unsolder the welding joint connecting the gas valve
and the liquid valve, remove them.
Note:
Discharge the refrigerant completely befor unsoldering;
when unsoldering, wrap the gas valve with a wet cloth
completely to avoid damage to the valve caused by
high temperature.
8. Remove electronic expansion valve
Remove the terminals of the electric expand valve
fitting and rotate to remove the electric expand valve
tting
.
Unsolder the welding joint connecting the electronic
expansion Valve and then remove the electronic
expansion valve.
9. Remove electric box assy
Unplug the terminals, unscrew 1 screw that secures
the electrical box assy, release the two snaps on the
electrical box assy (in the clapboard and condenser
angle), pull outwards, and remove the electrical box
assy.
welding joint
electric expansion
valve sub-Assy
electric expand
valve tting
Electric Box Assy
liquid valve
gas valve
welding joint

Other manuals for Gree GWH12ACC-K6DNA1F/I

Related product manuals