Remove the nut xing axial ow blade and then
remove the blade.
Remove the grounding wire screw on the
electric box assy and then remove the
grounding wire. (See g 1)
a
c
b
Disconnect the wiring terminals of reactor,
compressor, high and low pressure switch,
compressor overload protector, temperature
sensor, outdoor fan motor and 4-way valve. (See
g 2)
Note: keep pressing the circlip when
disconnecting the wiring terminal of reactor;
keep pressing the retainer when disconnecting
other wiring terminals.
Remove the wire inside the wiring groove.
4. Remove axial ow blade
axial ow blade
nut
5.Remove electric box assy
ProcedureStep