EasyManua.ls Logo

Gree GWH18YE-S6DBA2A - Page 122

Gree GWH18YE-S6DBA2A
137 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
119
Installation and Maintenance
Service Manual
Step Procedure
7. Remove electric box assy
Remove the terminals, lift up and rotate the electrical
box assy to the right so that the snaps on the clapboard
are removed and the electrical box assy are removed.
8. Remove motor and motor support
Remove the screws xing the motor and then remove
the motor.
Remove the screws xing the motor support and lift the
motor support to remove it.
9. Remove gas valve, liquid valve and valve suppprt
Remove the valve support bolck, remove the screws
fixing the gas valve and the liquid valve,unsolder the
welding joint connecting the gas valve and the liquid
valve, remove them.
Note:
Discharge the refrigerant completely befor unsoldering;
when unsoldering, wrap the gas valve with a wet cloth
completely to avoid damage to the valve caused by
high temperature.
Remove the screws xing valve support, then remove
the valve support.
Motor support
Motor
Valve supprt
Liquid valve
gas valve

Related product manuals