EasyManua.ls Logo

GreenWorks 25112 - Installing Side Discharge Chute

GreenWorks 25112
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ASSEMBLY INSTRUCTIONS
Fig. 5
2
1
INSTALLING SIDE DISCHARGE CHUTE (See Figure 5)
• Lift the side discharge cover (1).
• Align the grooves on the deector (2) with the pins on the underside of the cover.
• Lower the deector until the hooks on the mower deck are secured in the openings in the
deector.
• Release the deector and cover.
17