EasyManua.ls Logo

Growatt MTL-S - Page 10

Growatt MTL-S
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Growatt New Energy Australia Pty Ltd
C1, 27-29 Fariola Street,
Silverwater NSW 2128
Phone: 02 8065 1298
Email: australia@ginverter.com
Email:
ausupport@ginverter.com
www.ginverter.com
Change 10 minutes average voltage 255v setting
Please note, this option is only valid for new version inverters installed after 9, October,
2016. Which meet the new AS4777.2:2015 standard. Old version inverters installed before
that date are not have 10 minutes average voltage 255v limitation, thus, this step is NOT
required.
Please follow the below steps to change the tripping voltage 10 minutes average voltage
255v setting:
(1) Continue with the above process, Choose “21.Vac 10min Avg”, as follows:
(2) Fill in the value in “Set value” field. We suggest change “21.Vac 10min Avg” value to 10

Related product manuals