EasyManua.ls Logo

Growatt SPH 8000TL3 BH User Manual

Growatt SPH 8000TL3 BH
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation
Operation Manual
&
Shenzhen Growatt New Energy Technology CO.,LTD
No.28 Guangming Road, Shiyan Street, Bao’an District,
Shenzhen, P.R.China
No.28 Guangming Road, Shiyan Street, Bao’an District,
Shenzhen, P.R.China
GR-UM-158 A-00-GR-UM-158 A-00-
+86 0755 2747 1942 +86 0755 2747 1942
www.ginverter.comwww.ginverter.com
T
E
W
service@ginverter.comservice@ginverter.com
Download
Manual
Growatt New Energy

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Growatt SPH 8000TL3 BH and is the answer not in the manual?

Growatt SPH 8000TL3 BH Specifications

General IconGeneral
ModelSPH 8000TL3 BH
CategoryInverter
ManufacturerGrowatt
Max. DC Voltage1000 V
Max. AC Output Power8000 W
Max. DC Power12000 W
Nominal DC Voltage620 V
Number of DC Inputs2
Number of MPP Trackers2
Nominal AC Power8000 W
Max. AC Power8000 W
Nominal AC Frequency50 / 60 Hz
THDi<3%
Euro Efficiency97.5%
DC SwitchYes
Protection DegreeIP65
Operating Temperature Range-25°C to +60°C
Cooling MethodNatural cooling
Max. Charging/Discharging Power8000 W
MPPT Voltage Range200 - 850 V
Nominal AC Voltage230 V
AC Voltage Range180 V - 280 V / 310 V - 480 V
Power Factor0.8 leading to 0.8 lagging
CommunicationRS485, WiFi, GPRS, Ethernet

Summary

1 Brief Introduction

1.4 Safety Instructions

Essential safety guidelines for installation and operation.

2 Safety

2.2 Safety Measure

Critical safety measures and warnings for operation.

4 Unpacking and inspection

5.1 Basic installation requirements

Essential criteria for selecting an installation location and environment.

5 Installation

5.3 Installation Instructions

5.3.2 Installation of SPH

Step-by-step guide for mounting the SPH inverter on the wall.

5.4 SPH System Connection Mode

5.4.1 Connection of PV terminal

Detailed steps for connecting PV input terminals.

5.4.2 Connection of AC terminal and off grid terminal

5.4.3 Connection of battery terminal

5.4.10 Grounding connection

6 Commissioning

6.1 Commissioning of SPH

Step-by-step guide for initial system commissioning.

6.2 Operation modes

Explanation of different operating modes for the SPH inverter.

6.2.1 Normal mode

6.2.2 Fault mode

6.2.6 Shutdown mode

6.3 Country setting

6.4.4 work mode set up

Export Limit Setup

6.5 Communication

6.5.3 The SPH's monitoring

7 Start-up and shut down SPH system

7.1 Start-up the SPH system

Step-by-step guide for starting up the SPH system.

7.2 Disconnect the SPH system

Procedure for safely shutting down and disconnecting the SPH system.

8 Attention of the installation environment, maintenance and cleaning

9 Fault removal

9.1 System fault information list and troubleshooting suggestions

Troubleshooting common system errors and fault messages.

Related product manuals