EasyManua.ls Logo

Growatt SPH 10000TL3 BH User Manual

Growatt SPH 10000TL3 BH
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation
Operation Manual
&
Shenzhen Growatt New Energy Technology CO.,LTD
No.28 Guangming Road, Shiyan Street, Bao’an District,
Shenzhen, P.R.China
No.28 Guangming Road, Shiyan Street, Bao’an District,
Shenzhen, P.R.China
GR-UM-158 A-00-GR-UM-158 A-00-
+86 0755 2747 1942 +86 0755 2747 1942
www.ginverter.comwww.ginverter.com
T
E
W
service@ginverter.comservice@ginverter.com
Download
Manual
Growatt New Energy

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Growatt SPH 10000TL3 BH and is the answer not in the manual?

Growatt SPH 10000TL3 BH Specifications

General IconGeneral
ModelSPH 10000TL3 BH
CategoryInverter
Max. DC Voltage1000 V
Nominal DC Voltage600 V
Number of MPPTs2
Nominal AC Output Power10000 W
AC Nominal Voltage230 V / 400 V
Frequency50/60 Hz
Total Harmonic Distortion (THD)<3%
DC Connection TypeMC4
Protection DegreeIP65
TopologyTransformerless
Operating Temperature Range-25°C to +60°C
Noise Level<30 dB
Cooling MethodNatural Convection
MPPT Voltage Range200 V - 950 V
Max. AC Output Power11000 VA
AC Voltage Range180-280V
Humidity0 to 100% (Non-condensing)
Power Factor>0.99 (Adjustable 0.8 leading - 0.8 lagging)

Summary

2 Safety

2.2 Safety Measure

Details essential safety precautions for handling high voltage and equipment.

5 Installation

5.1 Basic installation requirements

Specifies location, materials, and environmental conditions for SPH installation.

5.2 Installation requires tools and RJ 45 terminal sequence of the LAN line.

Lists required tools and explains the LAN line wiring sequence.

5.3 Installation Instructions

Step-by-step guide for physically mounting the SPH inverter on a wall.

5.4.1 Connection of PV terminal

Instructions for connecting the PV input terminals using MC4 connectors.

5.4.2 Connection of AC terminal and off grid terminal

Details connecting AC output and off-grid terminals for grid/backup power.

5.4.3 Connection of battery terminal

Guide for connecting the battery terminals using MC4 connectors.

5.4.4 Connection of meter terminal

Instructions for connecting the meter terminal for energy flow monitoring.

5.4.10 Grounding connection

Details grounding requirements for the SPH inverter.

6 Commissioning

6.1 Commissioning of SPH

Steps for electrifying and commissioning the SPH inverter after installation.

6.2 Operation modes

Explains the different operating modes of the SPH inverter.

6.2.1 Normal mode

Details the normal operation states including online and backup modes.

6.2.2 Fault mode

Describes how the SPH handles and displays system or machine faults.

6.4.4 work mode set up

Guide to configuring various operating modes of the SPH inverter.

7 Start-up and shut down SPH system

7.1 Start-up the SPH system

Step-by-step guide to starting up the SPH inverter.

7.2 Disconnect the SPH system

Procedure for safely disconnecting and shutting down the SPH system.

8 Attention of the installation environment, maintenance and cleaning

9 Fault removal

9.1 System fault information list and troubleshooting suggestions

Lists common error messages and their suggested solutions.

11 Decommissioning

12 Product specification

14 Contact

Related product manuals