English (GB)
16
6. Setting up the CUE frequency 
converter in an SPE system
The SPE system consists of the following:
• SPE pump set
• sine-wave filter
• CUE frequency converter.
The CUE has a start-up guide. Follow the 
instructions on the display.
Note that to compensate for the impact from long 
cable length, Automatic Motor Adaptation (AMA) is 
highly recommended to be set as described below:
After completing the installation and settings, go to 
parameter 1-29 "Automatic Motor Adaptation (AMA)" 
and select [2] Enable Reduced AMA. Then press 
[Hand on] to start AMA.
For further information regarding safety and 
advanced settings see the CUE Installation and 
operating instruction.
7. Motor installation
Valid for all MS/MMS
Valid for MS6000P only.
In case of unintended flow of water through a non-
energized pump, there is a risk that the moving parts 
of the pump and the motor will start rotating, thereby 
generating voltage over the terminals. The size of 
the voltage depends on the speed of rotation. 
Consequently, the motor terminals must be 
considered as live until proven otherwise.
8. Mechanical installation
8.1 Removing and fitting the cable guard
The cable guard is screwed onto the pump, it must 
be removed and fitted by means of screws. See 
pump installation and operating instructions.
8.2 Fitting of submersible drop cable and 
motor cable
Before fitting the motor cable to the motor, make 
sure that the cable socket is clean and dry.
To ease fitting of the cable, lubricate the rubber parts 
of the cable plug with non-conducting silicone paste.
Tighten the screws holding the cable to the torques 
stated below:
Connect the motor cable to the drop cable by original 
Grundfos cable termination kits, such as shrink tube 
type KM or cable termination kit type M0 to M4.
If necessary, shorten the motor cable to ensure that 
it is always covered with pump medium prior to 
making the cable termination as described above.
If the motor is delivered with the motor cable 
mounted, make sure that the screws are re-tightened 
to the torques specified in the table above.
Installation and operating
instructions
http://net.grundfos.com/qr/i/98870684
DANGER
Electric shock
Death or serious personal injury
- Switch off the power supply before 
starting any work on the product.
- Make sure that the power supply cannot 
be accidentally switched on.
DANGER
Electric shock
Death or serious personal injury
- Make sure that motor cable ends are 
not live before starting any work on the 
product.
- Make sure that the power supply cannot 
be accidentally switched on.
Once the cable guard is fitted, make sure 
that the pump chambers are aligned.
MS402: 3.1 Nm
MS4000: 3.0 Nm
MS6000: 4.5 Nm
MS6000P: 4.5 Nm
MMS6: 20 Nm
MMS8000: 18 Nm
MMS10000: 18 Nm
MMS12000: 15 Nm.