EasyManua.ls Logo

GSi 2000 Series - Page 34

GSi 2000 Series
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Installation
34 PNEG-2381 2000 Series U-Trough Bin Sweep Auger Unload System (72' - 78')
Pulley Taper Bore Hub Installation
1. Be sure the tapered cone surfaces of the bushing (77) and inside of the pulley (79) are clean and free
of grease and oil.
2. Place the bushing (77) in the pulley (79).
3. Place the bolts and lock washers (12) loosely in pull-up holes. Bushing (77) remains fully expanded
to assure sliding fit on the shaft.
4. With key (78) on shaft slide pulley (79) to the desired position on shaft. Be sure heads of bolts are on
the outside.
5. Tighten bolts alternately and progressively until they are pulled up tight. Tighten to 15 lbs.-ft. (20 Nm)
torque. Do not allow pulley (79) to be drawn in contact with the flange of bushing (77). There should
be a gap from 1/8" to 1/4" (3.2 mm-6.4 mm). (See Figure 4AP.)
NOTE: Do not over-tighten. Dry fit only.
Figure 4AP
Ref # Description Ref # Description
12 Bolt with Washer 78 Key
77 Bushing
79 Pulley
77
79
78
12

Other manuals for GSi 2000 Series

Related product manuals