16
Fixing the Top Unit in
the oset position
If you wish to commission the Hub, attach the Top Unit to the
Base Unit in the oset position. This allows you to access the
connectors in Compartment B while the Hub operates as normal.
To fix the Top Unit in the oset position, slide the plastic tabs into
the slots (Figures 8.1 & 8.2).
Please note that Hub commissioning requires special hardware
and software as well as training from Guru Home Systems. Please
contact us if you wish to commission units but don’t have the
training and equipment needed.
Figure 8.1 Putting Top Unit into oset position Figure 8.2 Top Unit in oset position