The Guru Hub comprises two sections:
1. The Base Unit – to be mounted to the wall inside the dwelling
and connected to mains input, control devices and data
inputs.
2. The Top Unit – to be connected to the Base Unit.
The Base Unit is designed for installation at second fix. It can
be installed, with covers in place, and safely left until the Top
Unit is installed. The Top Unit can be installed any time after the
Base Unit, but is intended to be installed once other trades have
completed their work and there is less risk of damage to the Top
Unit’s delicate components.
For information on how to operate the GURU Smart Energy Hub,
please read the User Guide.
Please read this entire installation manual before starting
installation. Please note that protection provided by the
equipment may be impaired if used in a manner other than as
specified in this installation guide.