3.
PRECAUTIONS BEFORE OPERATION
3.1
Unpacking the instrument
The product has been fully inspected and tested before shipping from the factory. Upon receiving the instrument, please
unpack and inspect it to check if there is any damages caused during transportation.
If
any sign of damage is found, notify
the bearer andor the dealer immediately.
3.2
Checking the Line Voltage
The product can be applied any kind of the line voltage shown in the table below. Before connecting the power plug to an
AC
line outlet, make sure the voltage selector of the rear panel
is
set to the correct position corresponding to the line voltage.
It might be damaged the instrument if connected to the wrong
AC
line voltage.
A
WARNING.
To avoid electrical shock, the power cord protective grounding conductor must be
/
!
\
connected to ground.
The fuse must be changed following after the line voltage shown as below:
T
0.63A
AC
1
15V 97-1 32V
T
0.3 15A
AC 230V 195-250V
A
WARNING.
To avoid personal injury, disconnect the power cord before removing the fuse holder.