MAIN
LANDING
GEAR
ASSEMBLY
SPITFIRE
•
Locate
main landing
gear
system
including. Main
landing
gear(
2.0mm
piano wire), ultra-light
wheel
rimx2,
Screwsx2,
Retainers.
(GWS-STICK-FAS6#1x2) (Pic.105)
•
Secure
the
landing
gear
to
the
mount
with
screws,
as
picture
shows.
•
Fix
the
retainer
to
the
axle.
(Rio.
108,109)
''
• A
complete
landing
gear
installation. (Pic.110)
•
2.0mm3Eli§15
'
llMlix2
'
^5l3ilfJJx2
°
(GWS-STICK-FAS6#1)x2 °
(Hi05)
•m
2.0mm^li§15MAi^liSl]gi:Stia]zll±^5l!imiJlll^ili^
°
(Hioe.ioz)
• °
(Bios.
109)
°
(B110)
COCKPIT
ASSEMBLY
M M
QD
^
it
•
Press
the
magnet
into
the
plastic part C®. (Pic.111)
•Apply
a small amount of OAglue to the
0®.
(Pic.112)
Frame
"A"
^#"A"
•
Use
epoxy
Glue for plastic
part
C®to
the
recess
of
the
cockpit. (Pic.113,114)
•
Secure
a slice of metal with
epoxy
glue
.(Pic. 115)
• Glue
the
plastic part
C®on
the
recess
of
the
fuselage. (Pic. 116)
•
Drill
two 3mm holes on the fuselage of the plastic part C®for connecting part C@of canopy. (Pic.117)
°
(Bill)
• °
(^112)
•
»m^®l^ABP5nBlll^]5$J^lli[a]:®tiiiZB
° (B113,114)
• °
(Bii5)
°
(Biie.)
• B$IBfi^C®Ji5LfiZM1^3mm#lili-|ffl5L
®B117)
-14-