HAMWORTHY HEATING LTD
21
FLEET W series
500001211/F
Pipe work connections to boiler are fitted correctly.
All necessary isolation valves are open.
Condense connections on boiler and flue are connected and piped to drain.
Heat load is available.
6.4 Flue
Ensure that;
Flue system is correctly designed and installed to suit boilers.
Flue passages to chimney are clear.
6.5 Electrical
Ensure that;
Electrical connections are correct and isolatable.
External controls are operational.
WARNING: WHEN THE FRONT COVER IS REMOVED AND THE BOILER IS
OPERATIONAL, CARE MUST BE TAKEN WITH ELECTRICAL COMPONENTS AND
ACCESS TO PRIMARY INSULATION.