16
• After a few seconds, the display will show “-0.0-”. The meter is now zeroed and ready for
measurement.
• Press ZERO/CFM and the lamp, cuvette and detector icons will appear on the display, depending
on the measurement phase.
• Add the content of one packet of HI93751‑0 reagent, replace the cap and shake gently the
cuvette for 1 minute.
• Remove the cuvette.
MEASUREMENT PROCEDURE
• Replace the cuvette into the cuvette holder and ensure that the notch on the cap is positioned
securely into the groove.