26
3-90-00674R28_12/13
See your dealer for part details and installation
instructions.
Sample Mantel System
Note: Combustiblematerialsare allowed totouchthecabinet anywhere behindthefrontmountinganges except vent
clearanceareas.Thehearthsubstructuremaybebuiltofcombustiblematerialalthoughanon-combustiblehearthsurface
(tile,stone,metal,glass)mustextendasfarasshownontheappliance'sTestingLabel.
Fig.55
Fig.56
Accentra Insert Zero Clearance Cabinet
Be sure to use approved pellet
vent pipe wall and ceiling pass-
through fittings to go through
combustible walls and ceilings. Be
suretouseastartingcollartoattach
theventing systemtotheuestub
and seal the connection with high
temperaturesilicone.
HarmanZero
Clearancecabinet(top
ueonly)
Part#1-10-674070
Insert Wing & Mounting
Frame
InsertBody
When using 3" or 4" PL vent pipe,
there must be a 3" clearance to
combustibles.
Seenotebelow&refertopage14
foroorprotectionrequirements.
HarmanZeroClearanceBoxFlue
PipeRough-InSupport(optional)
Part#1-00-674119