2 Pinnacle Stair Lift Manual | | www.Harmar.com | 866-351-2776
Table of ContentsTable of Contents
Read and understand this manual prior to attempting stair lift installations. Please refer to the Owner’s Manual for
Limited Warranty information and operating instructions. The Owner’s Manual must be given to the owner of the
lift before it is put into service.
CONTENTS:
Important! It is imperative that this manual be read and understood prior to attempting installation of the stair lift.
Please observe all cautions and warnings in this manual, as well as on labels on the equipment.
I. PRELIMINARY CHECKS ................................................................3
A. Tools required ..............................................................3
B. Included parts...............................................................3
II. INSTALLATION PROCEDURES ....................................................4
A. Determine rail length...................................................4
B. Rail installation..........................................................5-6
C. Chassis installation.......................................................7
D. Final rail installation.....................................................8
E. Footrest and seat installation................................9-12
III. REMOTE CALL/SEND CONTROL OPERATION.......................12
A. Remote control operation.........................................12
B. Remote control reprogramming..............................12
IV. COMPLETION PROCEDURES ...................................................13
A. Test armrest control switch.......................................13
B. Tighten brackets.........................................................13
C. Set upper and lower travel limits............................13
D. Test safety stop switches..........................................14
E. Additional System Checks.........................................15
V. Folding Rail Installation........................................................16-20
VI. Folding Rail Conversion......................................................20-27