41
7. Initial Operation
NOTE!
During shipment, condensation moisture
can accumulate in the stove’s interior,
which may possibly lead to the appear-
ance of condensation or water on the
stove or ue pipes. Please dry off these
damp areas immediately.
Thesurfaceofyourstovewastreatedinasand-
blastingmachinebeforeapplyingthecolourcoat-
ing.Despitecarefulandthoroughinspection,there
may still be some residual material in the stove
body,whichcanfalloutwhenyourstoveisbeing
installed.
NOTE!
To prevent any damage, please immedi-
ately vacuum up these small steel pellets
with a vacuum cleaner.
Thersttimeastoveisoperated,theheatdevelop-
mentcausestheemissionofvolatilecomponents
fromthecoating,sealingstripsandlubricants,and
smokeandodourscanoccur.
Atahighercombustiontemperature,thisone-time
processcantakebetween4to5hours.
To achieve this higher combustion temperature,
please increase the fuel quantity recommended
inSection9,„AddingFuel/HeatingwithNominal
ThermalOutput“,byapproximately25%.
CAUTION!
To prevent adverse effects on health, no-
body should stay in the room(s) during
this process unless absolutely necessary.
Make sure the room is well-ventilated and
open the windows and outside doors. If
needed, use a fan for faster air circula-
tion.
If the maximum temperature is not reached dur-
ingtherst heatingoperation,youmaynotice an
odourforashortperiodoftimethenexttimethe
stoveisusedaswell.
g. 5
g. 6