EasyManua.ls Logo

Heiniger saphir - Operation; Initial Start-up and Setup

Heiniger saphir
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 Translation of the original instructions / Small animal clipper
6 Operation
WARNING!
Incorrect operation may cause damage on persons or objects. Therefore:
y Do all the steps of operation according to the indications in this instruc-
tion manual.
6.1 Initial start-up
6.1.1 Setting up the charging station
y Observe all technical data according to the operating conditions (3 Tech-
nical Data).
y The installation surface must be even and must dispose of su󰀩cient sta-
bility and payload.
y The location of installation must be protected against humidity and rain.
y Power outlets in the outer area must be equipped with a residual current
circuit breaker (FI).
y The workplace must dispose of su󰀩cient illumination and ventilation.
y The location of installation must be out of reach of children.
Fig. 10
1. Place the charging station on a
rm, even, dry, clean and free
underground.
2. Plug the charging station in the
power outlet.
3. If possible, wall mounting on the
suspension guides (1) provided
for this purpose on the back of
the charging station (screw di-
ameter 4.5 mm).
4. The charging station has electronics that constantly check its functions.
A switchover may therefore last up to 3 seconds.
5. The permanent light of the green LED signalises, that the plug is connect-
ed correctly to the power outlet and the charging station is ready for use.
6. If the battery is very depleted, the charging station wakes the battery.
This may require up to 5 minutes. After that the normal charging process
will start.

Other manuals for Heiniger saphir

Related product manuals