EasyManua.ls Logo

Hendi 230442 - Operating Cycles of the Device

Hendi 230442
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
EN
6. BEFORE FIRST SWITCH-ON
For safety reasons, it is recommended that the wa-
ter installation of the device is vented before the
first switch-on. In order to do so, water inlet to the
softener must be shut off. Consecutively, the sam-
pler valve after the water softener must be opened,
whereas the mains valve of the building shall be
opened gently. Water flowing will push air out
through the open sampler valve. A bubbling sound
will appear and water may gush. One shall wait un-
til the flow of water stabilizes and then close the
sampler valve. The system is now vented.
6.1. VENTING. FILLING WATER INTO THE DEVICE
In order to vent the device, the sampler valve after
the water softener must be opened, whereas the
mains valve of the building shall be opened gently.
Then, one shall proceed as in the case of venting
the entire system. It is recommended that the de-
vice is filled with water gradually, with breaks, in
order not to increase pressure inside the device
abruptly.
ATTENTION! The salt tank must be filled with salt and water before the first switch-
on of the device. One shall wait 30 minutes before salt dissolves in water. Resin
regeneration must then be performed.
6.2. FIRST RESIN REGENERATION (ONLY 230459 MODEL)
Regeneration must be activated with the usage of the manual regeneration button. Regeneration will
be done automatically. After it finishes, the device is ready to operate.
7. OPERATING CYCLES OF THE DEVICE
In serve the device is in the position of the first operation cycle, i.e. water treatment. Water
ows though the device. Raw water enters the container with resin through the
controller, flows through the resin and is directed upwards, through a distribution
pipe, to the controller and further to the system.
BACKWASH
The device is in the position of the second operation cycle - anti-current rinse
(backwash). Raw water enters the container with the filter bed through an inlet valve and
is directed downwards with a central pipe. Water flows through the resin, rinses it and
uffs it, and then is directed to sewage. In this cycle the controller shuts off water inlet
to the water system. Thanks to which the controller protects the water system against
the penetration of impurities from rinsing.
BRINE DRAW SLOW RINSE T
he device in the position of third operation cycle - regeneration with brine and slow
rinsing. Raw water with brine enters to the container with the filter bed through an inlet
valve. Flowing through the bed in the tank, it regenerates its ion exchange capacity. After
owing through the bed, water is directed to sewage. After all brine in the brine tank is
used up, the ion exchange bed is rinsed slowly with water, which guarantees thorough
rinsing brine and proper regeneration conditions. In this cycle the controller shuts off
water inlet to the water system. Thanks to which the controller protects the water
system against the penetration of impurities from rinsing.