EasyManuals Logo

Henny Penny Evolution Elite Assembly

Henny Penny Evolution Elite
3 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Henny Penny Evolution Elite™ Open Fryer: Drain Pan Assembly
Standards
The Drain Pan Assembly consists of:
Drain Pan
Metal Screen
Filter Pad
Retaining Ring
Crumb Catcher
Drain Pan Lid
Drain Pan Assembly
Start with a clean drain pan assembly every morning. Make sure all the parts are dry
to prevent dampening filter pad and break down oil.
Put the metal screen on the bottom of the drain pan.
Put the filter paper (when using Magnesol) or filter pad - smooth side facing down (if
not using Magnesol), on top of the metal screen
Put the retaining ring on top of the filter pad to prevent crumbs from being sucked
through the hole in the bottom of the drain pan and blocking the pump.

Other manuals for Henny Penny Evolution Elite

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Henny Penny Evolution Elite and is the answer not in the manual?

Henny Penny Evolution Elite Specifications

General IconGeneral
ModelEvolution Elite
CategoryFryer
ConstructionStainless steel
Oil FiltrationYes
Gas typeNatural Gas or Propane
Energy EfficiencyHigh
Voltage120V

Related product manuals