Full high turnstile • User Manual
9
Gate open, free for passing
Chapter 2 Equipment Installations
Installation notes
Please read this manual carefully before install it;
As for the convenience of installation and maintenance, installation space height of at least
2.6 meters;
Make sure the whole is horizontal and the shaft is vertical;
Protective earth wire must be connected;
Please check all wires has been properly connected before power on;
Please test all function before using;
Equipment Installation
1) Tool preparations
Screw driver and other common wiring
tool
M12x100 Expansion screws 8pcs
Impact drill(including D16 and
D14 drills)
2) Ensure the installation location and the system composition ,prepare to install after carrying out
the system planning;
3) Make well of installation of equipment foundation base.