EasyManua.ls Logo

Hitachi PC-ARFH1E - Page 68

Hitachi PC-ARFH1E
79 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
59
PMEN0602 rev.0 - 05/2023
1
MENU
PC-ARFH1E FUNCTIONALITIES
Swimming Pool (Fixed in input 3 if swimming pool is enabled): Consider Swimming pool in
Demand ON when the signal is ON.
Solar (Fixed in input 4 if solar is enabled): To let YUTAKI know that external Solar management
system is ready to provide Solar energy.
Operaon: To switch between space cooling and space heang.
DHW Boost (Fixed in input 6 if is DHW Boost is enabled): If it is set to open (NC), boost signal
ON if circuit is open. If it is set to close (NO), boost signal ON if circuit is closed.
Power Meter 1 (Fixed in input 7 if Power Meter 1 is enabled): To count any pulse received from
the power meter 1 and sent to central control energy consumpon calculaon.
Forced Heang: Force mode heang when input is closed
Forced Cooling: Force mode cooling when input is closed.
SG2: To acve the dierent estates of Sm Grid Ready.

Table of Contents

Related product manuals