10 Servicing
381
SMGB0087 rev.0 - 12/2013
10
10.4.14 Removing Electronic expansion Valve and Solenoid Valve
1 Remove the service cover, the bottom service cover and the rear cover following “10.4.1Removingservicecover” and
“10.4.4Removingthebottomservicecoverandrearcover”.
2 Recover the refrigerant from check joints according to “10.4.7Removingthecompressor”.
3 Remove the coils according to “10.4.10RemovingReversingvalvecoil”and “10.4.12Removingsolenoidvalvecoil
(SVAandSVC)”.
4 Remove the brazed parts as shown in the gures.
- Electronic Expansion Valve (EVO) Brazed Parts: 2
- Solenoid Valve (SVA) Brazed Parts: 2
- Solenoid Valve (SVC) Brazed Parts: 2
a. Remove the electronic expansion valve and the solenoid valve with cooling the valve bodies by wet cloth.
b. Perform the brazing work with attention not to burn the electrical wirings and the piping insulations.
Brazing Part
Solenoid valve
(SVA)
Brazing parts
5 When reassembling after replacing the valves, perform in the reverse procedure of removing.
N O T E
Runtheleadwirestobelocatedtotheoriginalposition,andxthembytheplasticband.